PROJECT DESCRIPTION:
The work for the 12,000 square foot Fire Station includes a masonry and steel structure with complete interior improvements. The interior construction included dormitories, men’s and women’s restrooms, a full kitchen, pantry, locker / turn out room, training and fire prevention offices and a workout room. The building is equipped with an isolated emergency back-up generator system and 1000 gallon fuel storage tank with ATS. Also included are full on-site and off-site improvements including high and low voltage underground infrastructure, site concrete, asphalt, mobilized gates and fencing. The site is fully landscaped and includes underground water and sewer installations on & offsite as well as underground gas lines from a remote location, underground electrical services for the installation of emergency signals and site lighting.